Aquatic Linings 0418 64 64 94

Home / Commercial pool relining

Commercial pool relining

We reline council, school, resort and commercial swimming pools with reinforced PVC membrane. Your existing shell stays in place, the leaks stop, and the pool gets a new surface without demolition.

Council pool refilling after being relined with new lane markings
Council pool refilling after relining

What relining does for an ageing pool

Most commercial pools that need work still have a sound concrete shell. What has failed is the surface: cracked and drummy tiles, open joints, tired paint and years of patch repairs that never quite hold. Relining puts a new, continuous waterproof membrane over all of it.

The membrane is heat-welded on site into one watertight layer, so water no longer reaches the cracks and joints behind it. It also gives you a clean new finish, with lane markings and wall targets built into the lining.

Pools we reline

  • 50 m and 25 m council pools
  • Learners, toddlers and program pools
  • Indoor competition and training pools
  • School pools, private and state
  • Resort, hotel and apartment pools
  • New builds, including modular steel pool systems

Why reline instead of rebuild

Rebuilding means demolition, a long closure and the biggest budget. Retiling strips the old surface but still relies on grout and render to hold water, so cracks tend to come back. A membrane reline works with the shell you already have, which usually makes it the fastest and most cost-effective way to get a leaking pool back in service.

We inspect every pool before we quote. If the real problem is the structure or the pipework, we'll tell you before you spend anything on a lining.

Membranes we install

We install AquaForce, AlkorPlan 2000 and Alkor Vanity 3D Touch reinforced membranes, and we're not tied to a single brand. We recommend the one that suits your pool, your budget and how the facility is used.

Where we've worked

Our projects include council pools at Narromine, Coonabarabran, Baradine, Mansfield and Beechworth, school pools across Queensland, Southport Central on the Gold Coast, resort pools at Yulara and Defence work at HMAS Creswell. We work Australia-wide, including remote and regional sites.

Common questions

How long does a commercial pool reline take?

It depends on the size of the pool and how much preparation it needs. You get a realistic timeframe with your quote, and we plan the work around your season.

Do we need to remove the old tiles?

Usually not. In most cases the membrane goes straight over existing tiles or concrete once loose or damaged areas have been prepared.

Can you add lane markings and wall targets?

Yes. Lane lines, T-marks and wall targets are built into the lining, so they won't peel or fade like paint.

Other services

Tell us about your pool

Call Tim on 0418 64 64 94 or send a few details and we'll arrange an inspection.